# EQIP Application Packet ## MT- LAND AND CATTLE LLC **Prepared by CHELCIE | August 24, 2026** --- ## CLIENT PROFILE | Field | Value | |-------|-------| | Legal Name | MT- LAND AND CATTLE LLC | | EIN | 41-3604243 | | State Formed | Kansas (2025) | | Address | 22170 West 191st Street, Osage County, KS | | Phone | (913) 488-4974 | | Email | DEREKTHOMAS58@GMAIL.COM | | Owners | Derek Thomas, Lee Mudd | | Producer ID | PRD-98UVZC | | Operation Type | Cow/calf | | Acres Owned | 880 | | Head Count | 142 | | Lender | Lyndon State Bank | | FSA/NRCS Status | Not sure — must verify before applying | | SAM.gov Status | Not sure — not required for EQIP | --- ## NRCS OFFICE CONTACT **Osage County NRCS Field Office** 115 W 17th Street Lyndon, KS 66451 **Phone: (785) 828-4631** **Kansas NRCS State Office:** (785) 823-4500, Salina, KS **First call:** Ask to schedule a conservation planning visit. Mention: cow/calf operation, 880 acres, interested in prescribed grazing, cross-fencing, and water development. Mention you are a beginning farmer (LLC formed 2025). --- ## STEP 1: PRE-APPLICATION CHECKLIST Before submitting NRCS-CPA-1200, complete these in order: - [ ] **Get FSA Farm Number** — Visit the Osage County FSA Service Center (same building or nearby the NRCS office in Lyndon). Required before NRCS can process an EQIP application. - [ ] **Gather entity documents** — LLC formation papers (Articles of Organization), EIN verification letter - [ ] **Gather land documents** — Deed(s) for all 880 acres; written lease agreement if any acres are leased - [ ] **Confirm beginning farmer status** — LLC formed 2025, less than 10 years in the business = qualifies for Beginning Farmer/Rancher (90% cost share vs. 75% standard) - [ ] **File AGI Certification with FSA** — Adjusted Gross Income certification is required. Filed at FSA, not NRCS. - [ ] **Verify HEL/WC compliance** — Highly Erodible Land and Wetland Conservation certification. You have streams/wetlands on property — flag this upfront with NRCS. - [ ] **Do NOT start any conservation work** until contract is signed and in hand. Any work started early is ineligible for reimbursement. --- ## STEP 2: APPLICATION FORM **Form: NRCS-CPA-1200** (October 2025 version) Download: https://www.nrcs.usda.gov/sites/default/files/2026-01/NRCS-CPA-1200.pdf ### Pre-filled Answers for Derek/Lee **Applicant:** MT- LAND AND CATTLE LLC **Application Date:** _______________ **Location where assistance requested:** 22170 West 191st Street, Osage County, KS **Question 1 — FSA customer record:** - Answer once FSA farm number is confirmed (currently unknown) **Question 2 — Programs interested in:** - ✅ Environmental Quality Incentives Program (EQIP) - Also consider checking CSP (Conservation Stewardship Program) — no conflict, separate program **Question 3 — Applicant Information:** - Business Structure: Entity (LLC) - Legal Name: MT- LAND AND CATTLE LLC - Tax Number (last 4): 4243 - Both Derek Thomas and Lee Mudd should be listed as members **Question 3b — Historically Underserved Categories (CRITICAL — check all that apply):** - ✅ **Beginning Farmer or Rancher** — LLC formed 2025, less than 10 years operating - Possibly ✅ **Limited Resource Farmer or Rancher** — Gross farm income under $50k qualifies; confirm with NRCS > Checking these boxes unlocks **90% cost share** (vs. 75%) and **advance payment eligibility**. Do not skip. **Question 4 — Land Information:** - Land Type: ✅ Private Land - Control: ✅ Deed or other evidence of land ownership - Currently enrolled in other USDA programs: No (confirm) - Primary crop type: Pasture/rangeland - Primary livestock type: Beef cattle (cow/calf) **Question 5 — Electronic delivery:** ✅ Yes (use DEREKTHOMAS58@GMAIL.COM) **Assistance Requested section:** Write in: > Prescribed grazing plan (528), cross-fencing for rotational grazing (382), livestock watering facilities (614), livestock pipeline (516), brush management for eastern red cedar (314). 880-acre cow/calf operation. Beginning farmer — LLC formed 2025. --- ## STEP 3: PRIORITY PRACTICE SELECTION Ranked by resource concern match, payment potential, and ranking score impact. --- ### TIER 1 — Apply Immediately (Core Bundle) #### Practice 528 — Grazing Management (Prescribed Grazing) **Why:** Client explicitly needs rotational/managed grazing. 880 acres with 142 head requires a documented grazing plan. This is the anchor practice — it drives ranking points and is required to justify the fencing and water system. | Component | Unit | HU Rate (90%) | Estimated Acres | Est. Payment | |-----------|------|---------------|----------------|-------------| | Range, Standard | Ac | $8.91 | 880 | $7,841 | | Range, Intensive | Ac | $21.72 | 880 | $19,114 | | Livestock Deferment, Standard | Ac | $19.44 | 880 | $17,107 | | Prescribed Grazing Mgmt, ≤5 Ac | Ac | $247.96 | — | — | **Recommended:** Range, Intensive ($21.72/ac) — matches the paddock-rotation system you're building. $19,114 estimated. --- #### Practice 382 — Fence (Cross-fencing for Rotational Grazing) **Why:** Client's #1 stated infrastructure need. 880 acres divided into ~8 paddocks (110 ac each) requires substantial interior fencing. Cross-fencing is the highest-priority use of Practice 382 in Kansas. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Barbed or Smooth Wire, Multi-Strand | Ft | **$3.04** | | High Tensile, Electric, 5+ Wires | Ft | **$3.27** | | High Tensile, Electric, 4 Wires or Less | Ft | **$2.46** | | Woven Wire, 96 Inches | Ft | **$7.73** | | Virtual Fence, Startup Year 1, Base Cost | No | **$10,023.57** | | Virtual Fence, Startup Year 1, Implementation | No | **$48.81/unit** | | Virtual Fence, Transmitter Station | No | **$6,979.09** | **Estimated payment example:** 15,000 lnft of high-tensile electric (5+ wire) at $3.27/ft = **$49,050** > Virtual Fence is worth evaluating — lower installation cost, full paddock flexibility. Ask NRCS about eligibility. --- #### Practice 614 — Watering Facility **Why:** Every paddock in a rotational system needs water access. With streams on property, this means frost-free tanks or piped systems at each paddock gate. Without water per paddock, the rotational system fails. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Frost Free Tank | No | **$2,097.02** | | Permanent, Small, Base Cost | No | **$847.23** | | Permanent, Small, Implementation | Gal | **$2.84** | | Permanent, Large, Base Cost | No | **$2,587.50** | | Permanent, Large, Implementation | Gal | **$0.81** | | Water Storage Tank, Base Cost | No | **$1,407.61** | | Water Storage Tank, Implementation | Gal | **$1.11** | | Insulated Tank with Cover | Gal | **$4.30** | | Tire Trough | Gal | **$2.29** | **Estimated payment example:** 8 frost-free tanks at $2,097 = **$16,776** --- #### Practice 516 — Livestock Pipeline **Why:** Distributes water from source to paddock tanks. Essential if relying on a central well or rural water connection rather than per-paddock surface water. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | HDPE, Base Cost | No | **$1,642.19** | | HDPE, Implementation Cost | Lb | **$5.05** | | Polyvinyl Chloride, Base Cost | No | **$1,238.73** | | Polyvinyl Chloride, Implementation | Lb | **$8.05** | | Rural Water Connection Equipment | Ea | **$5,085.20** | | Difficult Trenching Conditions | LnFt | **$23.97** | | Horizontal Boring | LnFt | **$132.21** | **Estimated payment example:** Rural water connection ($5,085) + 3,000 lnft HDPE at $23.97 (difficult terrain) = **$77,000+** --- ### TIER 2 — High Priority (Apply in Same Cycle if Budget Allows) #### Practice 314 — Brush Management **Why:** Eastern red cedar encroachment is severe throughout eastern Kansas and the Flint Hills region. It directly degrades grazing land condition — the client's stated resource concern. Cedar control improves stocking rates significantly. Kansas NRCS prioritizes this. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Chemical Control, Ground Application | Ac | **$31.38** | | Chemical Control, Individual Plant Treatment | Ac | **$44.60** | | Mechanical Control for Large Shrubs, Medium Infestation | Ac | **$378.89** | | Mechanical Control, Hand Application | Ac | **$71.26** | | Mechanical Control, ≤1 Acre | Ac | **$496.51** | **Estimated payment example:** 200 acres of chemical control at $31.38 = **$6,276**; mechanical at $378.89 = **$75,778** --- #### Practice 561 — Heavy Use Area Protection **Why:** 142 head concentrating around water sources, gates, and feed areas creates muddy, degraded areas that impact water quality and animal health. Client has streams on property — NRCS will flag this. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Rock/Gravel on Geotextile | SqFt | **$2.81** | | Reinforced Concrete, Base Cost | No | **$1,631.19** | | Reinforced Concrete, Implementation | CuYd | **$582.20** | --- ### TIER 3 — Secondary Practices #### Practice 590 — Nutrient Management **Why:** Client has streams/wetlands on property and water quality is a stated concern. 142 head generates significant nutrients. A nutrient management plan helps with both water quality ranking points and compliance. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Nutrient Management | Ac | **$37.52** | | Manure | Ac | **$302.78** | | Adaptive Nutrient Management | Ea | **$2,847.73** | | Precision Nutrient Application | Ac | **$100.12** | #### Practice 512 — Pasture and Hay Planting **Why:** After cedar clearing (314), bare areas may need reseeding. Plan for this as a follow-on after brush management. | Component | Unit | HU Rate (90%) | |-----------|------|---------------| | Introduced Perennial Species | Ac | **$351.20** | | Native Perennial Species | Ac | **$430.96** | | Native Perennial Species, Low Input | Ac | **$215.34** | --- ## ESTIMATED TOTAL EQIP VALUE (90% Cost Share) | Practice | Description | Est. Payment | |----------|-------------|-------------| | 528 | Grazing Management, Intensive, 880 ac | $19,114 | | 382 | Cross-fencing, 15,000 lnft high-tensile electric | $49,050 | | 614 | 8 frost-free watering units | $16,776 | | 516 | Pipeline system (rural water + distribution) | $30,000–$80,000 | | 314 | Brush/cedar management, 100–300 ac | $6,000–$75,000 | | 561 | Heavy use area protection, 3 sites | $8,000–$15,000 | | **Total Estimated Range** | | **$128,940–$254,940** | > EQIP contract cap: **$450,000/year per person; $900,000 over 6 years** for general practices. > Beginning Farmer/Rancher designation unlocks 90% cost share and **advance payment** before implementation. --- ## TIMING — CRITICAL | Event | Date/Status | |-------|-------------| | FY2026 primary ranking deadline | **January 15, 2026 — PASSED** | | Applications now | Automatically rolled to next funding cycle | | FY2027 signup likely opens | **Fall 2026 — Contact NRCS now** | | Threshold score to be funded (FY2026) | 20+ points | | Time from application to first payment | 6–18 months typical | **Action required immediately:** Call Osage County NRCS at (785) 828-4631 to schedule a site visit and ask about the next FY2027 batching date. Getting a conservation plan established now is the fastest path to an approved contract. --- ## DOCUMENTS TO BRING TO NRCS APPOINTMENT - [ ] MT- LAND AND CATTLE LLC Articles of Organization (LLC formation) - [ ] EIN verification letter (41-3604243) - [ ] Deed(s) for 880 acres - [ ] FSA farm/tract number (get this from FSA first) - [ ] Aerial/satellite map of the property (NRCS can print one, but bring what you have) - [ ] Photo documentation of resource concerns: degraded pastures, cedar encroachment, bare areas around water - [ ] Any prior conservation plans or soil test results - [ ] Authorization letters from landowner if any leased acres are included - [ ] Lease agreements for any leased acres --- ## RANKING STRATEGY — HOW TO MAXIMIZE SCORE Kansas EQIP uses a point-based ranking system (threshold: 20 points for FY2026). To score highest: 1. **Address multiple resource concerns in one application** — Grazing + Water Quality + Soil Health stacks points 2. **Bundle practices** — 528 + 382 + 614 + 516 as a complete rotational grazing system scores higher than single practices 3. **Claim Beginning Farmer/Rancher status** — Additional priority points, confirmed on CPA-1200 section 3b 4. **Streams/wetlands on property** — Riparian resource concerns score high. Mention explicitly. 5. **No existing NRCS plan** — First-time applicants with clear resource concerns typically rank well 6. **Document the conservation problem** — Bring photos of degraded pastures, cedar, mud areas --- ## SOURCE DOCUMENTS | Document | URL | |----------|-----| | NRCS-CPA-1200 Application Form | https://www.nrcs.usda.gov/sites/default/files/2026-01/NRCS-CPA-1200.pdf | | FY2026 Kansas EQIP Payment Schedule | https://www.nrcs.usda.gov/sites/default/files/2026-03/FY26_EQIP_PaymentSchedule_0.pdf | | Kansas EQIP Program Page | https://www.nrcs.usda.gov/programs-initiatives/environmental-quality-incentives-program/kansas/environmental-quality | | Kansas Ranking Criteria | https://www.nrcs.usda.gov/sites/default/files/2026-03/Exhibit%20A%20%20Program%20Ranking%20Criteria%20for%20NRCS%20Publication_EQIP_KS.pdf | | EQIP Advance Payment Info | https://www.nrcs.usda.gov/resources/guides-and-instructions/eqip-advance-payment-option | | How to Apply | https://www.nrcs.usda.gov/programs-initiatives/eqip-environmental-quality-incentives/apply-for-environmental-quality | | Osage County NRCS (LandCAN) | https://www.landcan.org/local-resources/Lyndon-Service-Center/60542/ | --- *Payment rates from FY2026 Kansas NRCS EQIP Payment Schedule (March 2, 2026 version). Rates subject to change. All estimates use HU (historically underserved/beginning farmer) rates at 90% cost share. Actual contract amounts determined by NRCS after site visit and practice design.*